Best ADU Company US - Eano

A Detailed Construction Checklist For Bathrooms & Kitchens

By

Ann

|Last Updated: 26 May 2025

We want your bathroom project to go smoothly. We've been through the process and understand what can go wrong and ways to avoid it.

Free Bathroom and Kitchen Renovation Checklist (+ How to Build Your Own)

Whether you’re remodeling a bathroom, updating a kitchen, or tackling both, a project checklist keeps your jobs on track, your crew organized, and your clients confident in your process.

 

This free bathroom and kitchen renovation checklist covers everything from site prep and demolition to installation and client handoff—helping you deliver quality work on time, every time.

 


 

Get Your Free Bathroom + Kitchen Remodel Checklist PDF

 

Keep your team consistent and your clients satisfied with this ready-to-use checklist covering:

 

  • Site inspections

  • Demolition tasks

  • Electrical and plumbing rough-ins

  • Fixture installation

  • Tile, cabinetry, appliances, and final finishes

  • Clean-up and customer walk-through

[Download the Template PDF] 

 


 

Why You Need a Renovation Checklist

 

Remodeling work involves many moving parts—subcontractors, permits, material orders, and client expectations. A well-structured checklist helps:

 

  • Reduce delays and miscommunication

  • Improve quality control

  • Standardize work across teams

  • Ensure nothing is missed from inspection to handoff

  • Build client trust through professionalism and transparency

 


 

How to Use Your Bathroom & Kitchen Checklist

 

You can print and use the checklist as-is or customize it for different project scopes. Add tasks specific to:

 

  • Full gut remodels

  • Cosmetic makeovers

  • Accessibility upgrades

  • Luxury finishes or smart home features

 

Use digital tools like Eano Pro to turn your checklist into live task trackers your team can access from phones or tablets on-site.

 


 

What to Include in Your Bathroom and Kitchen Renovation Checklist

 

 

1. Pre-Project Planning Checklist

 

✅ Review signed contract and approved design plans

✅ Confirm all permits are submitted or issued

✅ Schedule subcontractors (electricians, plumbers, tilers, etc.)

✅ Order all materials (fixtures, appliances, tiles, cabinetry)

✅ Notify client of start date and prepare for dust/noise protocols

✅ Walk the site with the client and mark areas of concern

 


 

2. Site Prep & Demolition

 

✅ Cover flooring and furniture in adjacent areas

✅ Set up temporary dust barriers and signage

✅ Shut off water, electricity, and gas where applicable

✅ Remove existing fixtures, tiles, cabinetry, and appliances

✅ Haul away demolition debris and clean the site

 


 

3. Rough-In Phase (Plumbing + Electrical)

 

Plumbing:

✅ Relocate or install new water lines and drains

✅ Pressure test all lines for leaks

✅ Install shower/tub valves, toilet flanges, sink drains

 

Electrical:

✅ Update wiring to code (GFCI outlets in wet areas)

✅ Reposition switches, outlets, or lighting as needed

✅ Pre-wire for under-cabinet lights or appliances

✅ Schedule inspections for both trades

 


 

4. Framing, Insulation, and Drywall

 

✅ Repair or adjust framing for new layouts or fixtures

✅ Install blocking for wall-mounted vanities or grab bars

✅ Add insulation for soundproofing or exterior walls

✅ Hang and finish drywall (apply mud, tape, sand smooth)

 


 

5. Waterproofing & Tiling

 

Bathroom:

✅ Apply waterproof membrane around showers and tubs

✅ Install backer board for wall tiles

✅ Lay floor tiles with proper slope to drains

✅ Grout and seal tile surfaces

 

Kitchen:

✅ Tile backsplash or accent walls

✅ Seal grout to prevent staining

 


 

6. Cabinetry, Countertops & Fixtures

 

✅ Install kitchen and vanity cabinets, ensure they’re level

✅ Mount countertops and caulk edges

✅ Install sinks, faucets, garbage disposals

✅ Mount bathroom mirrors, accessories, and shelving

 


 

7. Final Installation & Finishing Touches

 

✅ Install appliances (range hood, oven, dishwasher, fridge)

✅ Mount light fixtures, fans, towel bars, and smart devices

✅ Paint walls and touch up trim

✅ Caulk and seal around fixtures and joints

✅ Test all plumbing and electrical systems

 


 

8. Post-Construction Cleanup

 

✅ Remove all debris, tools, and dust barriers

✅ Clean floors, windows, cabinets, and counters

✅ Polish hardware and appliances

✅ Take photos for portfolio and client records

 


 

9. Client Walk-Through & Final Handoff

 

✅ Test all faucets, lights, and appliances with the client

✅ Review any remaining punch list items

✅ Provide warranty details and care instructions

✅ Collect final payment and request feedback or a review

✅ Offer optional maintenance plan or service follow-up

 


 

Why Clients Love Seeing the Checklist

 

Handing clients a completed checklist at the end of the job shows transparency and care. It reassures them everything was done correctly—and sets your business apart.

 

“When a contractor gives me a copy of what’s been done and cleaned, I feel confident recommending them. It’s the little things that matter.”
Melanie R., Homeowner

 


 

Get Started with Better Renovation Workflows

 

Use this checklist with digital tools like Eano Pro to:

  • Manage project stages from your dashboard

  • Assign tasks to subcontractors

  • Track material usage and delivery

  • Send invoices and collect payment in-app

  • Capture before-and-after photos for each stage

 

Try Eano Pro FREE for 14 days to streamline your next remodel.

Get In Touch
Thank you for visiting Eano! Subscribe now to receive free renovation tips, discounts on materials and more!

Sign up with your email and phone number — we’ll send a code for future logins, no password needed!

Or

Learn about Eano ADU

Make the most of your backyard

Learn More

TOP 10 POSTS

Best ADU Company US - Eano

Sending Updates through WhatsApp to Eano's Daily Logs

24 Sep 2024

Best ADU Company US - Eano

New Pro User Onboarding Page

13 Sep 2024

Best ADU Company US - Eano

Eano Pro Booking Page

31 Jul 2024

Best ADU Company US - Eano

Getting Started with Eano for Homeowners

20 Sep 2024

Best ADU Company US - Eano

Eano Pros Team Roles and System Access Guide

02 Sep 2024

Best ADU Company US - Eano

Project Scope Templates

26 Jul 2024

Best ADU Company US - Eano

How to Find Subcontractors For Your Project

31 Jul 2024

Best ADU Company US - Eano

How to Create Your Free Contractor Website Using Eano Pro

22 Oct 2024

Remodeling Service

ADU

Harness the New Era of Housing Flexibility

Bathroom

Create Your Dream Bathroom

Flooring

Small Update To Full Remodel